Daily WSKt and ŚDZt profiles for Lw gas are presented in the table below:
Tariff Group | WSKt [kWh/oC] | ŚDZt [kWh/point] |
---|---|---|
Lw-1.1 i Lw-1.2 | 0,000 | 3,739 |
Lw-2.1 i Lw-2.2 | 0,377 | 21,079 |
Lw-3.6 i Lw-3.9 | 7,653 | 19,429 |
Lw-4 | 51,276 | 133,816 |
Go to page About PSG
Read about the strategy of Polska Spółka Gazownictwa sp. z o.o. for 2016-2022.
The core goal of investment in PSG is connecting new customers.
Go to page Security
Find out what to do when gas is leaking.
Go to page Career
Go to page Contact us
Tariff Group | WSKt [kWh/oC] | ŚDZt [kWh/point] |
---|---|---|
Lw-1.1 i Lw-1.2 | 0,000 | 3,739 |
Lw-2.1 i Lw-2.2 | 0,377 | 21,079 |
Lw-3.6 i Lw-3.9 | 7,653 | 19,429 |
Lw-4 | 51,276 | 133,816 |
Tariff Group | WSKt [kWh/oC] | ŚDZt [kWh/point] |
---|---|---|
Lw-1.1 i Lw-1.2 | 0,003 | 3,541 |
Lw-2.1 i Lw-2.2 | 0,491 | 18,525 |
Lw-3.6 i Lw-3.9 | 6,228 | 20,746 |
Lw-4 | 46,908 | 185,824 |
Tariff Group | WSKt [kWh/oC] | ŚDZt [kWh/point] |
---|---|---|
W-1.1 i W-1.2 | 0,037 | 3,291 |
W-2.1 i W-2.2 | 0,383 | 14,880 |
W-3.6 i W-3.9 | 6,841 | 15,399 |
W-4 | 43,836 | 115,460 |
Also, bear in mind that as of August 1, 2014 the values of gas heating demand marked in the Distribution Network Code as ΔLDGo or ΔLDGrare determined in accordance with Technical Standard of the Chamber of the Gas Industry ST-IGG-2701:2014, entitled “Principles of Fuel Gas Billing in Energy Units” Item 4.2.3 Formula 7, and if the condition specified in Formula 8 is met, allocations are made in accordance with Formula 9.
Please be advised that, since June 1, 2014, the Distribution System Operator (DSO) has sufficient IT systems for Distribution Service Customers (DSC) - End Customers, for which the allocation at outputs is determined based on the algorithm provided by DSC End Users (in accordance with Items 20.2.4 or 20.2.5 of the Distribution Network Code), to perform operational and billing allocations in accordance with Items 20.4 and 20.5 of the Distribution Network Code. In connection with the above, the SDO ceases to make allocations for DSC End Users in proportion to the nominations according to Item 20.5.13 of the Distribution Network Code.
The modernization of ICT systems which support other DSCs are underway, and we will inform you about their completion in a timely manner.
In connection with the approval of the President of the ERO of the new Transmission Network Code at OGP Gaz-System and the new Distribution Network Code at Polska Spółka Gazownictwa, on January 1, 2014 the rules of commercial balancing were changed.
The most important change is the merger of the existing six distribution areas of high-methane E gas into one distribution area, for which OGP Gaz-System has designated the following new virtual point numbers:
Distribution Network Code Distribution Contract ORCS map and gas quality